Dynamic efforts in crane bridge through optimization of movement of crane

Authors

  • V.S. Loveykin ,
  • Yu.A Romasevich
  • V.V. Krushelnitsky

Abstract

The paper solved problem of minimizing intensity change of horizontal loads in metal elements of crane during its start-up. Tasked solved by method of calculus of variations. The work illustrated with diagrams, describing process of launching crane with minimal change in intensity of horizontal dynamic loads.

Downloads