PREDICTION OF ELECTRIC LOAD SUBSTATION 110 (35) / 10 KV RETROSPECTIVE DAILY HOURLY SCHEDULE OF POWER CONSUMPTION.

Автор(и)

  • A. Skrypnyck
  • A. Gai
  • V. Kostyuk

Анотація

Supposed to use the flow of information Automatic system of electrical energy record and control functioning embedded in substations with voltage of 110 (35) / 10 kV, for forecasting electrical loads substations during their operation.

Завантаження

Номер

Розділ

Статті