ANALYSIS OF BASIC ERRORS IN CONSTRUCTIONGRAVITY MANURE PERIODIC SYSTEM ACTION ON PIG COMPLEX

Authors

  • N.I. Boltyanska ,

Abstract

In paper basic errors are considered at building of the drift system of moving away of manure of batch – type during building of modern and reconstruction of old pig farms, in particular violation of correct geometry and depth of baths, errors at the gasket of drift pipe, building of receiving reservoir of the sewage pumping station and her rigging.

Downloads